Tata Tigor EV Charging in Thrissur
Thrissur, Kerala

Range315 km
Battery26 kWh
Max DC Charging25kW
Avg. Charging Time24 min
18
Compatible Stations
18
Operational
18
Fast Charging
7
Operators
Tata Tigor EV Compatible Stations in Thrissur
Charging Options for Tata Tigor EV
CCS2
DC Fast ChargingMax: 25 kW18 stations
Type 2 AC
AC ChargingMax: 3.3 kW0 stations
Compatible Stations in Thrissur
ANERT EESL - KILA Thrissur
OperationalShornur Road
Compatible Connectors:
CCS (Type 2) (60kW)Type 2 (Tethered Connector) (22kW)
DC Fast: 60kW(18 min)
AC: 22kW(50 min)
EESL (IN)
Chennai Ananda Bhavan
OperationalNH 544
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(18 min)
Zeon Charging
Viyyur KSEB
OperationalOpposite Central Jail
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
(Unknown Operator)
Tata.ev Hyson Motors - Tata Power
OperationalNH 544
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(18 min)
Tata Power
Hilite Mall
OperationalThrissur Mamangalam Road
Compatible Connectors:
CCS (Type 2) (120kW)CCS (Type 2) (60kW)CCS (Type 2) (24kW)
DC Fast: 120kW(9 min)
Zeon Charging
V8 Car Spa (EVOK) - ChargeMOD
OperationalThrissur Palakkad Road
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
ChargeMod (IN)
Plug and Share Charge EVCS - ChargeMOD
OperationalThrissur Shornur Road
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
ChargeMod (IN)
Guardian EV Charging Station by Imminent Future - ChargeMOD
OperationalThrissur Palakkad Road
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
ChargeMod (IN)
MB#Bridgeway Motors - ChargeZone
OperationalNH 544
Compatible Connectors:
CCS (Type 2) (30kW)CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
Chargezone (India)
Flash Hub EVCS - ChargeMOD
OperationalHigh Road
Compatible Connectors:
CCS (Type 2) (30kW)CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
ChargeMod (IN)
Vydyuthi Bhavan KSEB EVCS - ChargeMOD
OperationalKottappuram Road
Compatible Connectors:
CCS (Type 2) (30kW)Type 2 (Tethered Connector) (22kW)
DC Fast: 30kW(36 min)
AC: 22kW(50 min)
ChargeMod (IN)
PCK Centenary
OperationalMG Road
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
Tata Power
Nesto Hypermarket
OperationalThrissur Kuttippuram Road
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(18 min)
Zeon Charging
TML Hyson Motors - Tata Power
OperationalThrissur Kuttippuram Road
Compatible Connectors:
CCS (Type 2) (25kW)CCS (Type 2) (25kW)
DC Fast: 25kW(44 min)
Tata Power
Shobha City Mall EVCS - GO EC
OperationalShobha City Mall Road
Compatible Connectors:
CCS (Type 2) (60kW)CCS (Type 2) (25kW)Type 2 (Tethered Connector) (7.4kW)
DC Fast: 60kW(18 min)
AC: 7.4kW(2h 28m)
GO EC (IN)
Sree Rama EVCS - GO EC
OperationalNH 544
Compatible Connectors:
CCS (Type 2) (60kW)CCS (Type 2) (30kW)
DC Fast: 60kW(18 min)
GO EC (IN)
Daiz and Co. EVCS - GO EC
OperationalAyyanthole Road
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
GO EC (IN)
Korner EVCS - ChargeMOD
OperationalKanakamala
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(36 min)
ChargeMod (IN)
Other Cities in Kerala
Tata Tigor EV Key Features
7-inch Touchscreen
ConnectNext Technology
Dual Airbags
Electric Sunroof