EV charging station · Noida, Uttar Pradesh
At a glance
- Max power
- 120 kW
- Charging points
- 2
- Connector types
- 1
- Pricing
- On request
Connectors
Estimated charging time here
Approximate times at this station's top speed of 120 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 9 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 16 min |
| MG ZS EV | 50.3 kWh | 10–80% | 20 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 28 min |
Location
FAQ
What connectors does Berger Tower Charging Station have?
Berger Tower Charging Station offers CCS (Type 2), with a maximum charging speed of 120 kW. Check your EV's connector type for compatibility before visiting.
Is Berger Tower Charging Station a fast charger?
Yes. With up to 120 kW of DC Rapid DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Berger Tower Charging Station?
Pricing isn't published for this station. Public charging in India is typically billed per kWh; confirm the current rate with the operator (Statiq (IN)).
Where is Berger Tower Charging Station located?
It's located at DND Flyover, Sector 16B, Noida, Uttar Pradesh, 201301. Use the "Get directions" button for turn-by-turn navigation.