EV charging station · Erode, Tamil Nadu

Texvalley

Operated by Zeon Charging Website

OperationalPublicFast DC
Get directions

At a glance

Max power
60 kW
Charging points
1
Connector types
4
Pricing
On request

Connectors

IEC 60309 3-pinIEC 60309 3-pin
Operational
3.3 kWAC (Single-Phase)×1Level 2 : Medium (Over 2kW)
CCS (Type 2)IEC 62196-3 Configuration FF
Operational
60 kWDC×2Level 3: High (Over 40kW)
Type 2 (Tethered Connector) IEC 62196-2
Operational
22 kWAC (Three-Phase)×1Level 2 : Medium (Over 2kW)
CCS (Type 2)IEC 62196-3 Configuration FF
Operational
30 kWDC×2Level 3: High (Over 40kW)

Estimated charging time here

Approximate times at this station's top speed of 60 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.

EVBatteryChargeEst. time
Tata Tiago EV24 kWh10–80%19 min
Tata Nexon EV40.5 kWh10–80%31 min
MG ZS EV50.3 kWh10–80%39 min
Hyundai Ioniq 572.6 kWh10–80%56 min

Location

Loading map…
NH 544, Salem - Cochin HighwayGangapuram ChithodeErode, Tamil Nadu, 638102India
Open in Google Maps

FAQ

What connectors does Texvalley have?

Texvalley offers IEC 60309 3-pin, CCS (Type 2), Type 2 (Tethered Connector) , CCS (Type 2), with a maximum charging speed of 60 kW. Check your EV's connector type for compatibility before visiting.

Is Texvalley a fast charger?

Yes. With up to 60 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.

How much does charging cost at Texvalley?

Pricing isn't published for this station. Public charging in India is typically billed per kWh; confirm the current rate with the operator (Zeon Charging).

Where is Texvalley located?

It's located at NH 544, Salem - Cochin Highway, Erode, Tamil Nadu, 638102. Use the "Get directions" button for turn-by-turn navigation.

Other charging stations nearby

All in Erode