EV charging station · Bengaluru, Karnataka
At a glance
- Max power
- 60 kW
- Charging points
- 1
- Connector types
- 1
- Pricing
- 14.99/kWh
Connectors
Estimated charging time here
Approximate times at this station's top speed of 60 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 19 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 31 min |
| MG ZS EV | 50.3 kWh | 10–80% | 39 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 56 min |
Location
FAQ
What connectors does Divyashree Greens have?
Divyashree Greens offers CCS (Type 2), with a maximum charging speed of 60 kW. Check your EV's connector type for compatibility before visiting.
Is Divyashree Greens a fast charger?
Yes. With up to 60 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Divyashree Greens?
Pricing at this station: 14.99/kWh. Confirm current rates with the operator before charging.
Where is Divyashree Greens located?
It's located at Visitor Parking, Pine Valley, Embassy Golf-links Business Park, Off Intermediate Ring Road , Bengaluru, Karnataka, 560071. Use the "Get directions" button for turn-by-turn navigation.