EV charging station · perundurai , Tamilnadu
At a glance
- Max power
- 44 kW
- Charging points
- 1
- Connector types
- 1
- Pricing
- Rs.20/-
Connectors
CCS (Type 2)IEC 62196-3 Configuration FF
44 kWDC×1Level 3: High (Over 40kW)
Estimated charging time here
Approximate times at this station's top speed of 44 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 25 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 43 min |
| MG ZS EV | 50.3 kWh | 10–80% | 53 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 1.3 hr |
Location
Loading map…
About this location
More informationFAQ
What connectors does Ero G Electric Charging Station have?
Ero G Electric Charging Station offers CCS (Type 2), with a maximum charging speed of 44 kW. Check your EV's connector type for compatibility before visiting.
Is Ero G Electric Charging Station a fast charger?
Yes. With up to 44 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Ero G Electric Charging Station?
Pricing at this station: Rs.20/-. Confirm current rates with the operator before charging.
Where is Ero G Electric Charging Station located?
It's located at "NH544, Kovai to Salem Road,, perundurai , Tamilnadu, 638052 . Use the "Get directions" button for turn-by-turn navigation.