EV charging station · Bengaluru, Karnataka

Key Motors, Bannerghatta Road

Operated by Tata Power Website

OperationalPublicAC
Get directions

At a glance

Max power
24 kW
Charging points
1
Connector types
1
Pricing
21/kWh

Connectors

CCS (Type 2)IEC 62196-3 Configuration FF
Operational
24 kWDC×1Level 3: High (Over 40kW)

Estimated charging time here

Approximate times at this station's top speed of 24 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.

EVBatteryChargeEst. time
Tata Tiago EV24 kWh0–100%1.1 hr
Tata Nexon EV40.5 kWh0–100%1.9 hr
MG ZS EV50.3 kWh0–100%2.3 hr
Hyundai Ioniq 572.6 kWh0–100%3.4 hr

Location

Loading map…
#215/15, Arakere GateBannerghatta RoadBengaluru, Karnataka, 560076India
Open in Google Maps

FAQ

What connectors does Key Motors, Bannerghatta Road have?

Key Motors, Bannerghatta Road offers CCS (Type 2), with a maximum charging speed of 24 kW. Check your EV's connector type for compatibility before visiting.

Is Key Motors, Bannerghatta Road a fast charger?

This is an AC charging location (up to 24 kW), best suited for longer or overnight charging.

How much does charging cost at Key Motors, Bannerghatta Road?

Pricing at this station: 21/kWh. Confirm current rates with the operator before charging.

Where is Key Motors, Bannerghatta Road located?

It's located at #215/15, Arakere Gate, Bengaluru, Karnataka, 560076. Use the "Get directions" button for turn-by-turn navigation.

Other charging stations nearby