EV charging station · Ramanathapuram, Tamil Nadu
At a glance
- Max power
- 35 kW
- Charging points
- 1
- Connector types
- 1
- Pricing
- Rs.24/-
Connectors
CCS (Type 2)IEC 62196-3 Configuration FF
35 kWDC×1Level 3: High (Over 40kW)
Estimated charging time here
Approximate times at this station's top speed of 35 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 32 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 54 min |
| MG ZS EV | 50.3 kWh | 10–80% | 1.1 hr |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 1.6 hr |
Location
Loading map…
About this location
More informationFAQ
What connectors does KSN Charging Station have?
KSN Charging Station offers CCS (Type 2), with a maximum charging speed of 35 kW. Check your EV's connector type for compatibility before visiting.
Is KSN Charging Station a fast charger?
Yes. With up to 35 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at KSN Charging Station?
Pricing at this station: Rs.24/-. Confirm current rates with the operator before charging.
Where is KSN Charging Station located?
It's located at ECR junction , Devipattnam Road, , Ramanathapuram, Tamil Nadu , 623503. Use the "Get directions" button for turn-by-turn navigation.