EV charging station · Gandhinagar, Gujarat
MobiLane Charging Station
Operated by (Business Owner at Location)
At a glance
- Max power
- 80 kW
- Charging points
- 1
- Connector types
- 1
- Pricing
- On request
Connectors
Estimated charging time here
Approximate times at this station's top speed of 80 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 14 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 24 min |
| MG ZS EV | 50.3 kWh | 10–80% | 29 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 42 min |
Location
About this location
More informationDriver reviews
Awesome speed. Faster than usual.
Very fast Charging Station with 80KW DC Charger
FAQ
What connectors does MobiLane Charging Station have?
MobiLane Charging Station offers CCS (Type 2), with a maximum charging speed of 80 kW. Check your EV's connector type for compatibility before visiting.
Is MobiLane Charging Station a fast charger?
Yes. With up to 80 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at MobiLane Charging Station?
Pricing isn't published for this station. Public charging in India is typically billed per kWh; confirm the current rate with the operator ((Business Owner at Location)).
Where is MobiLane Charging Station located?
It's located at Beside Fire Station, Gujarat International Finance Tec-City, Gandhinagar, Gujarat, 382355. Use the "Get directions" button for turn-by-turn navigation.