EV charging station · Gandhinagar, Gujarat

MobiLane Charging Station

Operated by (Business Owner at Location)

OperationalPublic - Pay At LocationFast DC
Get directions

At a glance

Max power
80 kW
Charging points
1
Connector types
1
Pricing
On request

Connectors

CCS (Type 2)IEC 62196-3 Configuration FF
Operational
80 kWDC×1Level 3: High (Over 40kW)

Estimated charging time here

Approximate times at this station's top speed of 80 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.

EVBatteryChargeEst. time
Tata Tiago EV24 kWh10–80%14 min
Tata Nexon EV40.5 kWh10–80%24 min
MG ZS EV50.3 kWh10–80%29 min
Hyundai Ioniq 572.6 kWh10–80%42 min

Location

Loading map…
Beside Fire Station, Gujarat International Finance Tec-CityGandhinagar, Gujarat, 382355India
Open in Google Maps

About this location

More information

Driver reviews

rkp 5/5

Awesome speed. Faster than usual.

rkp 5/5

Very fast Charging Station with 80KW DC Charger

FAQ

What connectors does MobiLane Charging Station have?

MobiLane Charging Station offers CCS (Type 2), with a maximum charging speed of 80 kW. Check your EV's connector type for compatibility before visiting.

Is MobiLane Charging Station a fast charger?

Yes. With up to 80 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.

How much does charging cost at MobiLane Charging Station?

Pricing isn't published for this station. Public charging in India is typically billed per kWh; confirm the current rate with the operator ((Business Owner at Location)).

Where is MobiLane Charging Station located?

It's located at Beside Fire Station, Gujarat International Finance Tec-City, Gandhinagar, Gujarat, 382355. Use the "Get directions" button for turn-by-turn navigation.

Other charging stations nearby

All in Gandhinagar