EV charging station · Bhiwadi, Rajasthan

Subway

Operated by Statiq (IN) Website

OperationalPublicFast DC
Get directions

At a glance

Max power
60 kW
Charging points
1
Connector types
1
Pricing
On request

Connectors

CCS (Type 2)IEC 62196-3 Configuration FF
Operational
60 kWDC×1Level 3: High (Over 40kW)

Estimated charging time here

Approximate times at this station's top speed of 60 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.

EVBatteryChargeEst. time
Tata Tiago EV24 kWh10–80%19 min
Tata Nexon EV40.5 kWh10–80%31 min
MG ZS EV50.3 kWh10–80%39 min
Hyundai Ioniq 572.6 kWh10–80%56 min

Location

Loading map…
A2, Bhagat Singh Colony, Rajupet, U.I.T.Bhiwadi, Rajasthan , 123106India
Open in Google Maps

FAQ

What connectors does Subway have?

Subway offers CCS (Type 2), with a maximum charging speed of 60 kW. Check your EV's connector type for compatibility before visiting.

Is Subway a fast charger?

Yes. With up to 60 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.

How much does charging cost at Subway?

Pricing isn't published for this station. Public charging in India is typically billed per kWh; confirm the current rate with the operator (Statiq (IN)).

Where is Subway located?

It's located at A2, Bhagat Singh Colony, Rajupet, U.I.T., Bhiwadi, Rajasthan , 123106. Use the "Get directions" button for turn-by-turn navigation.

Other charging stations nearby